New Search

If you are not happy with the results below please do another search

1 search result for:

1

Complete the Silver Fern project, engine

We clean the motor housing thoroughly with brake cleaner and compressed air before assembly, because after all we have produced quite a bit of aluminum chips. To install the bearings, we heat the motor housing with a hot air blower to approx. 90 °. The ball bearings are treated with cold spray. Almost all bearings are shrunk in this way. The only exception is the B188 for [...]